Values · Value
Dates in a range
Every date between two dates, or only certain weekdays, up to 60: a month of meeting days, the Fridays until an event.
date.list_dates
In a flow
“Works out dates in a range whenever a step wired to it needs the answer.”
every Friday this month
What it does
Every date between two dates, or only certain weekdays, up to 60: a month of meeting days, the Fridays until an event. It's a value node: no white pins, it works out its answer when a step wired to it needs it. It gives 3 values later steps can use. Find it under Values in the palette.
When to use it
Use it when a step needs a value worked out first: every date between two dates, or only certain weekdays, up to 60: a month of meeting days, the Fridays until an event.
When not to
For a value that never changes, type it into the setting instead of wiring a node.
Typical wiring
Sockets: settings you can wire
- From Text
-
A date like 2026-10-01.
What goes there: Type it in the side panel, or wire in text. e.g. Hello there
If it's empty: Optional. Left empty and unwired, it uses 2026-10-01.
Connects fromA member's variablesAccept applicationAdd a Notion pageAdd a Trello cardAdd an emojiAdd to number in objectAdd up timesAdd working daysand 844 more
- To Text
-
A date like 2026-10-31.
What goes there: Type it in the side panel, or wire in text. e.g. Hello there
If it's empty: Optional. Left empty and unwired, it uses 2026-10-31.
Connects fromA member's variablesAccept applicationAdd a Notion pageAdd a Trello cardAdd an emojiAdd to number in objectAdd up timesAdd working daysand 844 more
Values it gives
- Dates List
-
Dates like 2026-10-02, oldest first. e.g. ["2026-10-02"]
If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.
Connects toAdd onboarding questionAdd to listAdd up timesAutoMod: add or remove allowed wordsAutoMod: add or remove wordsAutoMod: block wordsBar chartBest by a fieldand 88 more
- How many Number
-
How many. e.g. 5
If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.
Connects toAccount ageActive membersAddAdd answer to formAdd soundboard soundAdd timeAdd to a counterAdd to a leaderboardand 718 more
- As text Text
-
With commas. e.g. 2026-10-02, 2026-10-09
If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.
Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 577 more