Elementium Sign in
Contents

Values · Value

Percentile of a list

The value a given percent of a list sits under: the 90th percentile of response times, the top 10% of scores.

Free plan math.percentile

In a flow

“Works out percentile of a list whenever a step wired to it needs the answer.”

[1..100] 90 → 90

What it does

The value a given percent of a list sits under: the 90th percentile of response times, the top 10% of scores. It's a value node: no white pins, it works out its answer when a step wired to it needs it. It gives 2 values later steps can use. Find it under Values in the palette.

When to use it

Use it when a step needs a value worked out first: the value a given percent of a list sits under: the 90th percentile of response times, the top 10% of scores.

When not to

For a value that never changes, type it into the setting instead of wiring a node.

Typical wiring

Sockets: settings you can wire

Numbers List

The numbers to use, like the Numbers from Find numbers.

What goes there: Type it in the side panel, or wire in a list. e.g. Hello there, and more like it

If it's empty: Optional. Left empty and unwired, the step runs without it.

Connects fromAI check the answersAlarms that are dueBest by a fieldChange list atCheck for a lineClear a leaderboardCollect messages until doneColour gradientand 177 more

Percentile Number

0 to 100.

What goes there: Type it in the side panel, or wire in a number. e.g. 42

If it's empty: Optional. Left empty and unwired, it uses 90.

Connects fromA member's variablesAccept applicationActive membersAddAdd a forum tagAdd a labelAdd a row to a Google SheetAdd a staff noteand 500 more

Values it gives

Value Number

The number at that percentile. e.g. 90

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccount ageActive membersAddAdd answer to formAdd soundboard soundAdd timeAdd to a counterAdd to a leaderboardand 718 more

How many below Number

Numbers under it. e.g. 89

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccount ageActive membersAddAdd answer to formAdd soundboard soundAdd timeAdd to a counterAdd to a leaderboardand 718 more

Often next

Related in Values

Wires and sockets · Data values · Plans