Scoreboards & teams · Step
Show boss bar
Show a boss bar to a player, at the top of their screen.
m.bossbar.show
In a flow
“When a player joins → Show boss bar: event.”
When a player joins → Show boss bar: event.
What it does
Show a boss bar to a player, at the top of their screen. It's a step: it runs when the white wire reaches it, then the flow carries on from its Then pin. Find it under Scoreboards & teams in the palette.
When to use it
Use it when the flow needs to: show a boss bar to a player, at the top of their screen.
When not to
If nothing should change in Discord, a value node or a check is lighter.
Typical wiring
Sockets: settings you can wire
- Bar Text
-
The boss bar's name, so later steps can change it, like event or countdown.
What goes there: Type it in the side panel, or wire in text. e.g. Hello there
If it's empty: Optional. Left empty and unwired, it uses event.
Connects fromA member's variablesAccept applicationAdd a Notion pageAdd a Trello cardAdd an emojiAdd to number in objectAdd up timesAdd working daysand 845 more
- Player Player
-
Leave unwired for the player who started the flow, or wire one in, like Player from When a player joins.
What goes there: Type it in the side panel, or wire in a player. e.g. Alex
If it's empty: Optional. Left empty and unwired, the step runs without it.