Elementium Sign in
Contents

Starts when · Starts a flow

When the Ender Dragon changes its attack

Starts when the Ender Dragon moves from one phase of its fight to another.

Basic plan m.on.ender_dragon_change_phase

In a flow

“When the Ender Dragon changes its attack, the steps wired after it run.”

When ender dragon change phase → Broadcast {trigger.current_phase}

What it does

Starts when the Ender Dragon moves from one phase of its fight to another. It starts a flow, and gives the steps after it values about what happened. It gives 4 values later steps can use. Find it under Starts when in the palette.

When to use it

Use it to start a flow when the Ender Dragon changes its attack.

When not to

If the flow should start from a click or a command instead, pick that trigger: a flow has exactly one.

Typical wiring

Values it gives

Current phase Text

The current phase of the ender dragon change phase. e.g. minecraft:stone

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 578 more

Entity Entity

The entity of the ender dragon change phase. e.g. Zombie

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 554 more

Entity type Text

The entity type of the ender dragon change phase. e.g. minecraft:stone

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 578 more

New phase Text

The new phase of the ender dragon change phase. e.g. minecraft:stone

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 578 more

Often next

Related in Starts when

Wires and sockets · Data values · Plans