Elementium Sign in
Contents

Starts when · Starts a flow

When a furnace finishes an item

Starts when a furnace, smoker or blast furnace finishes smelting one item.

Basic plan m.on.furnace_smelt

In a flow

“When a furnace finishes an item, the steps wired after it run.”

When furnace smelt → Broadcast It happened!

What it does

Starts when a furnace, smoker or blast furnace finishes smelting one item. It starts a flow, and gives the steps after it values about what happened. It gives 3 values later steps can use. Find it under Starts when in the palette.

When to use it

Use it to start a flow when a furnace finishes an item.

When not to

If the flow should start from a click or a command instead, pick that trigger: a flow has exactly one.

Typical wiring

Values it gives

Block Block

The block of the furnace smelt. e.g. Stone

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 554 more

Result Item

The result of the furnace smelt. e.g. 1× Stone

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 554 more

Source Item

The source of the furnace smelt. e.g. 1× Stone

If it's empty: Empty when the step didn't make one (it stopped early or was skipped); steps reading it get nothing.

Connects toAccept applicationAdd a forum tagAdd a labelAdd a Notion pageAdd a row to a Google SheetAdd a staff noteAdd a stickerAdd a Trello cardand 554 more

Often next

Related in Starts when

Wires and sockets · Data values · Plans